Blue Origin Huntsville

Owner: Blue Origin

Contractor: Clayco and Lamar Johnson Collaborative

Location: Huntsville, Alabama

PROJECT DETAILS

350,000 SF. Manufacturing Center

WMB-ROI worked with Blue Origin to lay out their new engine manufacturing facility in Huntsville, Alabama. The new 350,000-SF facility will house the tooling and infrastructure equipment and operations required to manufacture the BE-4 liquefied natural gas (LNG) fueled rocket engine used in American orbital rockets. WMB-ROI (project management) handled all the process equipment and tooling planning, factory planning and logistics planning for the installation and set-up of the factory. The space is designed with the following features:

  • Tooling, factory and logistics planning for rocket engine equipment and supporting operations
  • Program Management
  • Engineering
  • Factory Space for the first Ox-Rich Staged Combustion Engine made in the United States